TitleProduct

Price of Akr Paper Cup Machine

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Zhejiang

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-26 00:17

  • Browse the number:

    190

Send an inquiries

Company Profile

Quanzhou Xinda Machinery Co., Ltd.

By certification [File Integrity]

Contact:Miss Phoenix Anny. a(Mr.)  

Email:

Telephone:

Phone:

Area:Zhejiang

Address:Zhejiang

Website: http://mingguomachinery.china-pki.com/

PRODUCT DETAILS

 

MG-Q12 Paper Cup Machine



Machine video link:
https://www.youtube.com/watch?v=J5TFQlAzdwU
https://www.youtube.com/watch?v=vANDAtSy5hA
https://www.youtube.com/watch?v=JaSQNcZQ_lI

 
MACHINE INTRODUCTION
MG-Q12 This type of paper cup forming machinery is a multi-station automatic cup making equipment. Installed with photoelectric sensor, fault detecting device, high-precision counter and other instruments, this paper converting instrument is frequently asked for production and manufacture of a comprehensive range of drink cups. The paper cup maker fulfills a number of complex procedures and is noted for easy operation, stable properties, little occupied area and high production.

 
TECHNICAL SPECIFICATION

Model MG-Q12
Paper cups specifications 2-12 oz(50ml-350ml)
 (mold exchangeable)
T:50-105mm
H:50-120mm
B:35-125mm
Production capacity 45-55pcs/min
Paper specification 150-350g single PE coated paper
Voltage 220V/380V
Power  3.5KW
Net weight 1500Kg
Dimensions 2800mm×1400mm×1700mm
Note  Customized service is available


 
AFTER SERVICES
A. One year warranty. (Non-artificial damage of parts we will send to customer, customer need pay for the transport cost.)
 
B.First time, when machine delivery, if customer need, then we will send the engineer to
customer country install the machine and adjust the machine for customer( customer
need pay the return tickets cost, hotel cost, visa cost, engineer salary 100usd/one day(include on the plane days)).
 
C.The details depend on contract or proforma invoice.


PAYMENT DETAILS
Payment term:30% deposit pay before produce, the left 70% arrange before the loading.
DELIVERY TIME
40 days after got the 30% deposit by TT.
CERTIFICATE